Home › Work activities › Analyze project data to determine specifications or requirements
O*NET detailed work activityAnalyze project data to determine specifications or requirements
AI-assistReview & check
10 jobs13 tasks
Use AI as a first-pass checker against a list of rules or standards. The final judgment and sign-off stay with you.
Part of Evaluate designs, specifications, or other technical data, under the O*NET work activity group Analyzing Data or Information. Individual tasks below can carry a different label when their own wording calls for it (1 AI-ready, 12 AI-assist, 0 stays human).
Tasks built on this activity
- Analyze test data to identify defects or determine calibration requirements.
- Analyze user needs and software requirements to determine feasibility of design within time and cost constraints.
- Study and analyze information about alternative courses of action to determine which plan will offer the best outcomes.
- Analyze information to determine, recommend, and plan installation of a new system or modification of an existing system.
- Analyze statistical data and product specifications to determine standards and establish quality and reliability objectives of finished product.
- Analyze information processing or computation needs and plan and design computer systems, using techniques such as structured analysis, data modeling, and information engineering.
- Analyze user needs to determine technical requirements.
- Assess existing facilities' needs for new or modified telecommunications systems.
- Obtain and evaluate information on factors such as reporting formats required, costs, or security needs to determine hardware configuration.
Tasks where it is part of the work
- Set specifications for materials, dimensions, and finishes.
- Gather data pertaining to customer needs, and use the information to identify, predict, interpret, and evaluate system and network requirements.
- Recommend changes to improve systems and network configurations, and determine hardware or software requirements related to such changes.
- Conduct analyses to determine the maximum amount of work that can be accomplished for a given amount of energy in a system, such as industrial production systems and waste treatment systems.