Home › Work activities › Lay cables to connect equipment
O*NET detailed work activityLay cables to connect equipment
Stays humanHands-on work
6 jobs10 tasks
This is physical, in-person work with real objects, tools, equipment and places that change from day to day. AI can't do it for you.
Part of Connect components or supply lines to equipment or tools, under the O*NET work activity group Handling and Moving Objects. Individual tasks below can carry a different label when their own wording calls for it (0 AI-ready, 0 AI-assist, 10 stays human).
Tasks built on this activity
- Feed cables through access holes, roof spaces, or cavity walls to reach fixture outlets, positioning and terminating cables, wires, or strapping.
- Run appropriate power, ground, or coaxial cables.
- Pull up cable by hand from large reels mounted on trucks.
- Run new speaker and electrical cables.
- Lay underground cable directly in trenches, or string it through conduits running through trenches.
- Lay underground cable directly in trenches, or string it through conduit running through the trenches.
- Pull cable through ducts by hand or with winches.
- Pull up cable by hand from large reels mounted on trucks.
- Lay cable and hook up electrical connections between machines, power sources, and phone lines.
- String cables between structures and lines from poles, towers, or trenches, and pull lines to proper tension.